Project Description
Do You Have A Project We Can Help With?
Avalon Peninsula, Newfoundland
Project consisted of construction of a new a 188-kilometre, 230kV transmission line to connect the existing Bay d’Espoir and Western Avalon Terminal Stations. The new line parallels two existing transmission lines from Bay d’Espoir to Sunnyside on the Avalon Peninsula.
LG Projects Ltd. Was engaged by Nalcor Energy/Newfoundland & Labrador Hydro to provide construction management and quality assurance personnel for conductor stringing of the new line.
Project Details
DATE
Aug – Dec 2017
PROJECT TYPE
Transmission